Fig. 6

Different cost scenarios simulated by Monte Carlo method. Source: The Authors. Dotted line represents the average cost in optimistic and pessimistic scenario, continuous line represents average cost of base scenario
Different cost scenarios simulated by Monte Carlo method. Source: The Authors. Dotted line represents the average cost in optimistic and pessimistic scenario, continuous line represents average cost of base scenario